Home/Electrical/Power Upgrades & Three-Phase
Electrical · Power & three-phase
Power upgrades and three-phase in Valencia — capacity for the all-electric home.
Induction, heat pump, EV, and the dryer — modern life draws hard. We measure your real demand, then upgrade wiring, panel and load balance from €490, so nothing trips at dinner.
Is this you
Capacity is short if…
The main breaker referees dinner
Induction and dryer can't coexist
An EV charger is coming — the panel isn't
A workshop or studio joined the house
Three-phase equipment waits on one phase
The house electrified; the wiring didn't
In plain terms
The all-electric home is here. Capacity should arrive first.
Homes electrify appliance by appliance until one evening the main breaker referees dinner. A measured load study shows what you actually draw; then wiring sections, panel and phase balance are upgraded to match the life you're actually living — with headroom for what's next.
Internal works, measured first
Logged, not guessed
Where three-phase serves the home
Tomorrow's loads counted today
How it works
Measure, plan, upgrade.
Load logging
Real consumption recorded across typical days.
Written plan
Works, sections and balance — itemised.
Upgrade works
Wiring, panel and management installed.
Verification
Loads re-measured; balance documented.
Why VELTORRA
Capacity, engineered in order.
Load study first
Consumption logged over days — decisions from data.
Sections that carry
Feeders and circuits sized for sustained draw.
Phases balanced
Three-phase loads spread so no leg struggles.
Priority logic
Load managers referee peaks automatically.
Future counted
EV, solar and climate included in the math.
The price
Priced from your data.
From €490 for internal upgrade works. The load study defines the scope honestly — sometimes management logic alone solves what looked like a capacity problem.
- Measured load study
- Wiring and section upgrades
- Panel and protection works
- Load management where apt
- Verification and documentation
The VELTORRA standard
Documented like every VELTORRA project.
Concealed work is photographed before it disappears behind walls, floors and ceilings.
Circuits, pressures and performance verified by measurement — not by assumption.
A documented workmanship guarantee alongside the manufacturer's warranty.
A single named person answers for your project — by message, if you prefer.
Service area · 39°28′N
The same standard at every address.
VELTORRA upgrades home power capacity across Valencia, Torrent, Paterna, Burjassot, Mislata, L'Eliana, Godella, Rocafort, Alboraya and Sagunto — the same starting prices, the same documentation and the same lead engineer at every address.
Related services
Plan the whole system, not one piece.
Questions, answered
Asked before hiring us.
How do I know if I need more power?
Measurement answers it: we log your real consumption across days. Often the honest answer is load management, not more capacity — the study costs less than guessing either way.
What does an upgrade cost?
Internal works from €490 — wiring sections, panel and balancing. The measured study fixes the scope in writing before anything is touched.
Do I need three-phase at home?
For most homes, no — modern load management stretches single-phase impressively. Three-phase earns its place with big climate systems, workshops or heavy simultaneous loads; the numbers decide.
Can you prepare for loads I don't have yet?
That's the efficient way: EV, solar and future climate counted in today's plan, so tomorrow is a connection — not another project.
Will upgrades disrupt the home?
Most works are panel-area and specific runs — a day or two, power staged politely, everything announced before it blinks.
Dinner and charging, simultaneously, calmly.
Send a few details — receive an itemised written estimate. No visits before you're ready, and no phone calls unless you ask for one.