VELTORRA
ES EN RU
Plan your project

Home/Solar Energy/Hybrid Inverters

Solar · Hybrid inverters

Hybrid inverter installation in Valencia — one brain for panels, batteries and the grid.

The inverter decides what your sunshine becomes: used, stored or wasted. Hybrid units from €1,490 — battery-ready, backup-capable, configured by people who read datasheets.

In plain terms

Panels make DC. Everything else is the inverter's judgement.

Every solar decision flows through one box: feed the kettle, charge the battery, hold for the evening. A hybrid inverter makes those calls natively — no bolt-ons, no adapter chains — and swaps into most existing systems in a day.

€1,490 Installed from

Hybrid unit, configured

1 Day to swap

Old inverter out, hybrid in

98%+ Conversion efficiency

The class we specify

Ready For batteries

Today or in three years

Why VELTORRA

Why the hybrid choice compounds.

01

Battery-native

Storage plugs in when you're ready — no re-engineering.

Ready
02

Backup-capable

Essential circuits can ride through cuts.

Resilient
03

Priority logic

House first, battery second, grid last — tuned to taste.

Tuned
04

Monitoring built in

Production and flows visible per hour, forever.

Visible
05

Sized with headroom

Tomorrow's EV and heat pump counted today.

Future-proof

How it works

A one-day brain transplant.

System review

Panels, strings and plans assessed.

Written quotation

Unit, capacity and price — itemised.

The swap

Old unit out, hybrid wired and mounted.

Configuration

Priorities, monitoring and limits set, documented.

The price

The upgrade, one written figure.

Starting price €1,490

From €1,490 installed and configured. Capacity and backup wiring move the figure — itemised before the old unit comes off the wall.

  • Hybrid inverter supplied
  • Removal of the old unit
  • Wiring and protections
  • Priority and backup configuration
  • Monitoring set-up and documentation

Is this you

The hybrid moment is now if…

Your inverter predates the battery era

A battery is planned within three years

Blackout backup would earn its keep

The old unit clips production on good days

Monitoring is a mystery box today

An EV or heat pump joins soon

Service area · 39°28′N

The same standard at every address.

VELTORRA installs hybrid inverters across Valencia, Torrent, Paterna, Burjassot, Mislata, L'Eliana, Godella, Rocafort, Alboraya and Sagunto — the same starting prices, the same documentation and the same lead engineer at every address.

Valencia Torrent Paterna Burjassot Mislata L'Eliana Godella Rocafort Alboraya Sagunto

Related services

The VELTORRA standard

Documented like every VELTORRA project.

Photo record

Concealed work is photographed before it disappears behind walls, floors and ceilings.

Testing before handover

Circuits, pressures and performance verified by measurement — not by assumption.

Written guarantee

A documented workmanship guarantee alongside the manufacturer's warranty.

One lead engineer

A single named person answers for your project — by message, if you prefer.

Questions, answered

Asked before hiring us.

What does a hybrid inverter cost?

From €1,490 installed and configured; capacity and backup wiring set the final figure, itemised in writing. The swap itself is typically one day.

Can I keep my existing panels?

Almost always — the hybrid connects to your existing strings. We verify voltages and layout during the review and confirm compatibility in writing.

Do I need a battery right away?

No — that's the point: the hybrid runs perfectly without one and accepts storage whenever you're ready, with no further rework.

What happens during a power cut?

With backup configured, essential circuits switch to battery in milliseconds. Without a battery yet, the inverter shuts down safely like any grid-tied unit — backup starts when storage arrives.

Is my current inverter worth replacing?

If it predates 2018, clips on bright days, or blocks a battery — usually yes. We'll read its data and give you the honest economics before recommending anything.

Upgrade the brain; keep the panels.

Send a few details — receive an itemised written estimate. No visits before you're ready, and no phone calls unless you ask for one.